We had the privilege of carrying out important work on the construction of the Metuchira River Bridge.
Our team was hired to make the foundation piles for the bridge's pillars and abutments, a crucial task to guarantee the structure's stability and safety.
During the construction process, we dedicated our efforts to driving a total of 71 piles. Each pile was carefully planned and installed, reaching depths of up to 25 metres. The diameter of each pile was meticulously designed to be 650 mm, guaranteeing the strength and stability needed to support the bridge's load.